Eksim Investment Holding has applied to EMRA (Energy Market Regulatory Authority) for 20 wind farm projects with total of 830 MW capacity based on wind measurements that had been made more than 100 locations all around Turkey since 2000.

As of today, 7 applications with 411 MW capacity have been approved and licensed by EMRA, currently 367 MW installed capacity is full operational. Eksim is still working to build the size of approximately 1000 MW capacity projects, is going to be one of the leading company in Wind Energy Sector.

Balıkesir - Susurluk WPP, the first Wind-Farm project of Eksim with 75 MW installed capacity, commissinoned in February 2011.

Tokat - Killik WPP with 94 MW installed capacity, commissioned within the fourth quarter of 2011.

Amasya - Kayadüzü WPP with 82 MW installed capacity, commissioned within the first quarter of 2012.

Silivri WPP with 45 MW installed capacity, commissioned within the third quarter of 2014. Licensed capacity is 60 MW.

Hasanbeyli WPP with 50 MW installed capacity, commissioned within the first quarter of 2014.

İzmir - Seferihisar WPP with 21 MW installed capacity, commissioned within the fourth quarter of 2016


Licensed projects;

Project Name and Location Company Name Installed Capacity (MW) Mechanical Power (MW) Status
Susurluk WPP, Balıkesir Susurluk Energy A.Ş. 72,5 75 Active
Hasanbeyli WPP, Osmaniye Hasanbeyli Energy A.Ş. 50 50 Active
Silivri WPP, İstanbul Silivri Energy A.Ş. 45 60 Active
Killik WPP, Tokat Tokat Energy A.Ş. 85 94 Active
Kayadüzü WPP, Amasya Merzifon Energy A.Ş. 75 82 Active
Seferihisar WPP, İzmir Seferihisar Energy A.Ş. 16 21 Active
Çeşme WPP, İzmir Çeşme Energy A.Ş. 18 28 Licensed

*Capacity increasing applies were made to EMRA.